Construction · focus vertical
Live agentSAP knows what you spent. Primavera knows you’re late. Nothing connects them.
Built for the $10M–$100M contractor. LayeredAI reads the schedule, the BOQ and the ledgers, and traces every site event to cash and margin.
Read-only
against your systems of record
SAP · P6 · BOQ
connected in one layer
Quoted evidence
on every flag it raises
Human sign-off
on every action
Try the construction risk agent
Construction Risk Agent
Site report → cash, schedule, margin, procurement
Reads only what you paste here. 3 free assessments. Press ⌘↵ to run.
Findings
Consequences appear here
Every flag names the category, the severity, and quotes the exact line in the report it came from.
A cancelled pour, traced to money
Thursday's site report notes the concrete pump broke down and the Block C pour was cancelled. This is the agent walking that one line through the project.
Read
Pour cancelled — pump breakdown; a replacement is available Sunday.
Schedule
The Block C slab sits on the critical path; a three-day slip consumes the float.
Cash
Twelve carpenters idle; formwork cost accrues with no earned value.
Procurement
The Sunday pump slot clashes with the rebar delivery — same crane window.
Action
Confirm the pump slot, resequence Block D and notify the client engineer today.
What it reads, does and shows
Reads
Does
Shows
Also connects to
How it runs
01
Ingest
Daily site reports, SAP cost exports, Primavera schedule updates and the BOQ land in one place each morning.
02
Cross-reference
Spend is lined up against progress against plan, item by item, instead of waiting for month-end.
03
Flag
Divergences surface with the exact source line quoted: the delayed pour, the uninstructed variation, the short delivery.
04
Brief
The PM and commercial lead get a ranked morning brief: what moved, what it touches, what to do first.
05
Decide
A human accepts, overrides or escalates each flag. The agent logs the decision and watches the follow-through.
Before and after
What it unlocks next
RoadmapBOQ vs. reality
Planned 10,000 tiles, trending to 12,000 — caught while there's still time to file the variation.
Change-impact analysis
A drawing revision or supplier delay traced through quantities, procurement, schedule, billing and cash.
Procurement intelligence
Required-on-site dates vs. the real supply path — a PO is not a delivery.
Resource visibility
Idle equipment and crew conflicts across sites, with feasibility checked before anything moves.
Cross-project learning
Every job teaches the system your real productivity rates, supplier reliability and client payment patterns.
Built for the $10M–$100M contractor — too big to run on the site engineer's memory, too small for a year-long enterprise rollout. Start with one or two read-only use cases and expand once the results have earned it.
Controls
Track record
Concluding an implementation with Vel Amrith, a construction and facility-management company in Riyadh, and in discussions with a second, larger Gulf group.
Bring one live project. We’ll show you what’s at risk.
The schedule, the BOQ, the cost report. One conversation.