10 days behind schedule.42% of budget spent.What happens to your cash?
SAP knows what you spent. Primavera knows you’re late. The BOQ knows what you planned. No system connects them. LayeredAI is the intelligence layer above your existing systems that turns operational events into their cash, margin, schedule and procurement consequences.
Read-only. Runs in your private cloud. We never write to your systems.
“Why is our next receipt on the Marina project at risk?”
Likely cash impact
SAR 28M receipt moves 18–25 days
Sources: SAP MM · PS · SD · Primavera · Confidence: Medium
10+
production systems
4–6x
ROI target on deployments
2
Gulf construction engagements
Reads from what you already run
Every system is right. Nobody has the answer.
When a project slips, the answer to ‘what does this mean for our cash and margin?’ lives across four departments. Today it takes the planning, projects, procurement and finance teams a day or two of meetings and Excel to assemble — with assumptions nobody can trace. By then, the month has moved on.
And ‘progress’ itself is not one number. A project can be physically 60% complete, 55% in the schedule, 50% commercially measured, 45% certified — and you can only invoice what’s certified. Any system that collapses these into one figure is quietly lying to you.
Al Nakheel Villas · Package 2
IllustrativeSix “progress” numbers, one project
Connect the systems once. Every question gets easier.
The core is a connected model of your business — WBS to activity to BOQ line to purchase order to milestone to cash. On that spine, each capability is the same reasoning applied to a different decision.
Core · demo-ready today
Early risk detection
Slipping activities, late POs and stale forecasts traced to their cost and cash consequences — before the month-end report.
Cash-flow intelligence
Forecasts adjusted to operational reality, not planned dates — including the work you've earned but not yet billed.
Management copilot
"Why is Project 3 behind?" answered with sources, confidence and freshness — without convening four departments.
What the spine unlocks next
01
BOQ vs. reality
Planned 10,000 tiles, trending to 12,000 — caught while there’s still time to file the variation.
02
Change-impact analysis
A drawing revision or supplier delay traced through quantities, procurement, schedule, billing and cash.
03
Procurement intelligence
Required-on-site dates vs. the real supply path — a PO is not a delivery.
04
Resource visibility
Idle equipment and crew conflicts across sites, with feasibility checked before anything moves.
Cross-project learning
Every job teaches the system your real productivity rates, supplier reliability and client payment patterns.
How much of your cash is sitting in unbilled work?
Every contractor carries earned-but-unbilled revenue — and every delayed milestone adds to it. Slide your numbers for a rough size, then let us find the real figure from your actual jobs.
Cash timeline estimator
Estimated earned-not-yet-billed
$2.2M
≈ 20 days of revenue trapped before an invoice even exists
≈ $183K per active job
Estimate only — directional, not a quote.
Find your real numberYour real number comes from your schedules of values, change orders and billing logs — that’s what the audit finds.
Evidence in. Consequences out. Humans decide.
We don't replace SAP, Primavera, your BOQ or your operational platforms. We create a construction-specific intelligence layer above them — built so a careful finance team can actually trust it.
01
Every answer shows its work
Sources, data freshness, assumptions and a confidence level on every conclusion. When systems disagree, it says so.
02
Real math, not model guesses
Cash arithmetic, variances and schedule calculations run deterministically. The AI reasons and explains — it never invents numbers.
03
Knows your market
Customized by market, industry and company — it knows a Saudi government client pays late because of process, not insolvency.
04
Read-only, your cloud
Runs in your private cloud, reads on a need basis, never writes to your systems. You choose what’s shared.
See your systems become a workflow, live.
A mocked run through four systems contractors already use. The composer itself wires up whatever you actually run.
Auto-composing · construction
In the field, not on a whiteboard.
In deployment
Concluding a Riyadh implementation
We're completing an implementation with Vel Amrith, a construction and facility-management company in Riyadh, and in discussions with a second, larger Gulf group — the same forward-deployed model behind our 10+ production systems.
Who it’s for
The $10M–$100M contractor
Too big to run on the site engineer's memory. Too small for a year-long enterprise AI rollout. Margins of 3–4% where a single unnoticed slip erases the profit on a job.
How we engage
Start small, at low risk
One or two use cases first, read-only, inside your own cloud. Expand only when the results have earned it.
“It’s an internal audit function we couldn’t otherwise afford.”
Finance lead, $20M construction firm · LayeredAI deployment
Beyond construction
Construction is our focus. The same operating spine — read the systems, connect the evidence, explain the consequences — already runs in production across other document-heavy, deadline-driven work.
In production · lead
Finance operations
Invoice match, collections and dispute triage for operations teams.
ExploreIn production
Real estate · Relay
Transaction coordination — production system keeping every date on track for real-estate teams.
ExploreIn production
Manufacturing & logistics
Supplier and PO tracking, milestone visibility across ERP and email.
ExploreIn production
Security & compliance
Questionnaires and vendor reviews drafted from your own policies.
ExploreThese systems fund and inform the construction brain — every deployment sharpens the same spine.
Ask us the question your systems can't answer.
Bring one live project — the schedule, the BOQ, the cost report. We'll show you what's connected, what's at risk, and what it means for your cash.